Project Summary
DLJ ENTERPRISES, INCORPORATED (owner)
December 2002 to Present
- •
Performed Plan and Cost Review Analyses on 50 or more projects per year.
- •
Performed Monthly Draw Inspections on 100 to 150 projects per year.
- •
Performed Existing Facility Analyses on 5 to 10 commercial properties per year.
- $15,000 Remodel of kitchen and master bathroom – Residence
- •
$1,875 Remodel of entry room – Residence
- •
$5,725 Dumpster gate repairs for St. Charles Place Homeowners Association – Riverview, FL (2013)
- •
Ventura Bay Homeowners Association – Riverview, FL – (2013)
- o
$1,500 roof repairs
- o
Inspection of ten existing building roofs
- o
$455 Sidewalk repair
- o
$1,000 Street Sign repairs
- o
$1,225 Southwest Corner Fence repairs
- o
$750 Miscellaneous Painting work
- o
$950 Soffit repairs
- o
$635 Roof repairs
- •
$4,750 Residence termite repairs (2013)
- •
$9,500 Residence water damage repairs (2013)
- •
$350 Chair rail install for a residence located in Lakewood Ranch, FL – (2013)
- •
$3,350 Kitchen Cabinet replacement –Residence, Riverview, FL – (2013)
- • Commercial Building and Retail roofing job in Tampa, FL (2013)
- o
$13,900 Upper Roof Replacement
- o
$6,625 Second Floor Apartment repairs
- o
$350 North Wall Crack repair
- o
$600 Elevator Repair
- o
$1,500 Lower Roof repairs
- • Commercial Building remodel in Tampa Fl.
- o
$6,950 Water Intrusion Repair and Window Replacement
- •
Worked for Homeowners Association – Riverview, FL – Contractor (2012)
- o
$7,935 Boundary Wall Gate Infill
- •
$16,000,000 Commercial Assisted Living Residence, Clearwater, FL - Owner’s Representative/Consultant
- •
$7,000,000 Estate residence on Lake Thonotosassa, Thonotosassa, FL – Owner’s Representattive/Consultant
- •
$700,000 Commercial ALF Home Fourth Floor Renovation, St. Petersburg, Florida – Owner’s Representative/Consultant
- •
$1,400,000 Commercial New Offices, Gift Shop, and Museum in Plant City, Florida – Owner’s Representative/Consultant
- •
$39,500 Commercial Drywall subcontractor for a 5 unit townhome building.
- •
$25,000 new entry drive, and miscellaneous work on a Quality Inn.
- •
Conducted Home Inspections on more than 50 residences per year.
DESIGN CIRCLE CONSTRUCTION COMPANY (Senior Construction Analyst)
(Independent Consultant through own firm DLJ Enterprises, Inc.)
August 2001 to March 2011
•
$500,000 Quality Inn & Suites – East Tampa (managed owner contracted vendors)
•
$500,000 East Lake Office Park Land Development, East Lake, Florida (Construction Manager)
•
Consulted as owner’s representative on 24 bed assisted living facility.
•
Conducted detailed financial audits on several projects.
•
Performed Construction Draw inspections on over 1,100 commercial projects and 1,500 residential projects.
•
Performed Existing Facility Analyses on 48 commercial properties and 30 residential properties.
•
Performed Plan and Cost Review Analysis on over 500 projects.
•
Performed Mold Testing on several properties.
IRWIN CONTRACTING, INCORPORATED (Project Manager)
May 2000 to June 2001
•
$16,000,000 Jordan Park Family Housing, St. Petersburg, FL
•
$2,900,000 Jordan Park Infrastructure, St. Petersburg, FL
•
$1,800,000 Jordan Park Senior Village, St. Petersburg, FL
•
$12,000,000 Mid Core Parking Garage, St. Petersburg, FL (assisted)
PETER R. BROWN CONSTRUCTION (Project Manager)
June 1999 to May 2000
•
$8,000,000 First Baptist Church of St. Petersburg, St. Petersburg, FL
•
$4,500,000 Pasadena Fundamental School, Pasadena, FL
•
$1,800,000 Gulf Coast Museum of Art, Phases II and III, Largo, FL
OPUS SOUTH CORPORATION (Project Manager)
August 1997 to May 1999
•
Maitland Promenade, Maitland, Florida
•
$14,500,000, 5 story, 240,000 sf office building
•
$4,500,000, 3 level, 318,000 sf, 1000 space parking garage
•
$65,000 tenant buildout
•
$95,000 tenant buildout
•
SecurityLink from Ameritech, Bradenton, Florida
•
$9,000,000, 2 story, 100,000 sf customer service center
•
$110,000 phase I interior remodel
•
$494,000 phase II interior remodel
•
Wausau Insurance Interior Build-out, Temple Terrace, Florida
•
$100,000 three phase expansion within occupied building
•
Miscellaneous projects
•
$40,000 Orlando office expansion
•
$120,000 total, on-going Tampa office expansions
•
Oversee design phase for $1,150,000 child care facility in Woodbridge, Virginia
DON STINE CONSTRUCTION CO., INCORPORATED (Project Manager)
March 1996 to August 1997
•
$650,000 Circle M convenience store, Plant City, Florida
•
$600,000 Circle M convenience store, Plant City, Florida
•
$1,000,000 Amerada Hess convenience store, Venice, Florida
•
$550,000 Berean Bible Community Church, Valrico, Florida
•
$650,000 RaceTrac convenience store, Orlando, Florida
•
$30,000 Subway counter addition, Pinellas Park, Florida
•
$30,000 Subway counter addition, Tampa, Florida
•
$50,000 Pizza Hut counter addition, Tallahassee, Florida
•
$25,000 Shell driveway addition, Gainesville, Florida
•
$60,000 Interior office buildout for Miles Oil Company, Plant City, Florida
•
Assistance on numerous other projects
HOLBEN CONSTRUCTION COMPANY (Project Manager/Superintendent)
May 1995 to November 1995
•
$30,000 Kentucky Fried Chicken remodel, Casselberry, Florida
•
$50,000 Kentucky Fried Chicken remodel, Pensacola, Florida
•
$20,000 Kentucky Fried Chicken remodel, Marianna, Florida
•
$100,000 Winn-Dixie renovation - drywall specialty, Lake City, Florida
•
$100,000 Winn-Dixie renovation - drywall specialty, Port Richey, Florida
•
$25,000 Kentucky Fried Chicken remodel, Haines City, Florida
•
$20,000 Kentucky Fried Chicken remodel, Orlando, Florida
•
$20,000 Kentucky Fried Chicken remodel, St. Petersburg, Florida
H. LEE MOFFITT CANCER CENTER (Owner’s Representative/Project Manager)
February 1993 to January 1995
•
$250,000 new roof at West Annex Building
•
$100,000 Dishwasher room renovation
•
$75,000 interior renovation, second floor of the old Southwest Florida Bloodbank Building
•
$50,000 reroofing portions of main hospital building
•
$60,000 research lab renovation/addition
•
$50,000 outpatient surgery unit renovation
•
$10,000 doctor office renovation
•
Planning and design review for $8 million building renovation for new research labs, research administration, and hospital support functions
•
Planning and research for new cooling tower screening
•
Planning and research for second water line installation
•
Coordination with environmental agencies for remediation of a diesel fuel spill
•
Assist department on other projects as needed.
HEERY ARCHITECTS AND ENGINEERS (Architect’s Representative)
September 1991 to January 1993
•
$950,000 Physician office expansion consisting of adding a second and third floor on top of existing H. Lee Moffitt Cancer Center.
TALLAHASSEE COMMUNITY COLLEGE (Owner’s Representative)
April 1988 to March 1991
•
$5,500,000 new building housing 18 classrooms, 60 faculty offices, 6 science laboratories, and administration space for two departments
•
$1,500,000 new parking lot
•
Reroof existing buildings
•
$1,500,000 phase I
•
$750,000 phase II
•
$100,000 phase III
•
$750,000 new building for maintenance, purchasing, and shipping and receiving departments
•
$500,000 interior renovation for and new computer room for state library system
•
$350,000 campus energy upgrades, including the addition of one new chiller unit, solar screens on windows, and lighting sensors.
•
$250,000 general interior renovations within five buildings
•
$125,000 campus lighting upgrade
•
Asbestos removal
•
$100,000 phase I
•
$50,000 phase II
•
$40,000 phase III
•
$75,000 elevation installation
•
$35,000 canopy and entry addition
•
Participation in the following;
•
5 year Educational Plant Survey
•
State of Florida Yearly Plant Audit
•
Updating the master facility listing
•
20 year Master Plan Study
•
Planning for a new administration building
•
Planning for renovation of a off campus building
•
Certified 6A-2 inspector for College
ALVAREZ CONSTRUCTION COMPANY (Superintendent)
May 1986 to August 1987
•
$1,500,000 shopping center, Gainesville, Florida
ELKINS INDUSTRIAL CONTRACTORS (Assistant Project Manager)
January 1985 to September 1985
•
$1,500,000 Wastewater Treatment Facility, Jacksonville, Florida
•
$1,600,000 foundation and slab work for USA Today, Rockledge, Florida
•
Assisted on minor projects at Mayport Naval Station, Jacksonville, Florida
UNIVERSITY OF FLORIDA PHYSICAL PLANT (Project Coordinator)
May 1984 to August 1984
•
$750,000 University of Florida President’s home renovation